Project Experience

General Rubber’s rich history of application-based solutions and project experience has earned us a place as an industry leader and product innovator. We have created case studies to communicate our extensive capabilities across multiple industries and sectors. Quality examples include our studies on developing 12-foot-diameter dismantling expansion joints for the world’s largest common cooling water system (Ras Laffan, Qatar), and developing an all-rubber in-line pressure-balanced expansion joint, used within newly constructed AP1000 nuclear plants (VC Summer 2,3 / Vogtle 3,4). The table below represents our experience across many industries and sectors, and includes links to the aforementioned case studies.

Project Client Application Project Location Year Products
Sea Water Cooling Expansion Project Almacon Power Yanbu, Saudi Arabia 2003 84", 136", 148" REJs w/ Control Units - Aluminum Bronze
Termorio ALSTOM Power Brasil 2002 6" thru 64" REJs w/ Control Units
Al Hidd ALSTOM Power Bahrain 2002 72" and 102" REJs w/ Control Units
Keppel Merlimau ALSTOM Power Singapore 2005 14" thru 106" REJs w/ Control Units
Elm Road Generating Stations-Units 1&2 Bechtel Power Oak Creek, WI | USA 2007 8" thru 66" REJs w/ Control Units
Nebraska City Power Black & Veatch Power Nebraska City, NE | USA 2007 2" thru 78" REJs w/ Control Units
Ras Laffan Common Cooling Water, Ph.1 Cat1 CCIC Oil & Gas Qatar 2003 60" thru 144" Dismantling
Ras Laffan Common Cooling Water, Ph.1 Cat1 CCIC Oil & Gas Qatar 2009 28" thru 138" Dismantling
VC Summer Nuclear Chicago Bridge & Iron Power-Nuclear Jenkinsville, SC | USA 2013-2014 36" & 108" In-Line Pressure Balanced REJs; 120" single and multiple arch REJs
Vogtle Electric Chicago Bridge & Iron Power-Nuclear Waynesboro, GA | USA 2013-2014 36" & 108" In-Line Pressure Balanced REJs; 120" single and multiple arch REJs
Ras Laffan Common Dodsal Engineering & Construction Oil & Gas Qatar 2009 60" thru 138" Dismantling REJs w/ Control Units
United Olfeins Complex Project Fluor Daniel Intercontinental Petrochemical Jubail, Saudi Arabia 2003 12" thru 60" REJs w/ Control Units
Hamaca Crude Upgrader Project Grupo Alvica USA, LLC Oil & Gas Venezuela 2002 4" thru 36" REJs w/ Control Units
Planta Esde III ICA Fluor through Oilmark Services Mining Cananea, Sonora Mexico 2013 1" thru 36" REJs w/ Control Units, over 100 pcs
Goro Nickel Project Inco Goro Nickel Mining New Caledonia 2006 32" thru 72" REJs
Brayton Point Closed Loop Cooling Project Kiewit Power Somerset, MA | USA 2010 60" thru 132" Dismantling REJs w/ Control Units
Carlsbad Kiewit Desalination Carlsbad, CA | USA 2014-2015 5" thru 16" Concentrcic and Eccentric Reducing REJs w/ Control Units
Kusile Power Station Lesedi through Crane Power Mpumalanga 2013 1.5" thru 28" REJs w/ rods, over 300 pcs
NASA, A-3 Test Stand, Stennis Space Center M & D Mechanical Aerospace Stennis Space Center, MS| USA 2010 1" thru 24" REJs w/ Control Units, over 700 pcs
Genentech CCP2 Bldg 2 and 3 Marelich Mechanical Pharmaceutical California | USA 2006 2" thru 18" REJs w/ Control Units
Minera Escondida Ltd-Sulphide Leach Project Outokumpu Mining Chile 2005 10" thru 42" PTFE lined REJs w/ Control Units
Waigagoqiao PP Phase II Siemens Power China 2004 102" REJs
Newark Energy Center Skanska Power Newark, NJ | USA 2013-2014 3" thru 78" REJs w/ Control Units
Wayne County Combined Cycle Plant TIC Power Goldsboro, NC | USA 2011 4" thru 102" REJs w/ Control Units
DC Water Ulliman Schutte Construction through Plant Piping Products Municipal Washington, DC | USA 2013 36" thru 72" REJs w/ Control Units