Project Experience
General Rubber’s rich history of application-based solutions and project experience has earned us a place as an industry leader and product innovator. We have created case studies to communicate our extensive capabilities across multiple industries and sectors. Quality examples include our studies on developing 12-foot-diameter dismantling expansion joints for the world’s largest common cooling water system (Ras Laffan, Qatar), and developing an all-rubber in-line pressure-balanced expansion joint, used within newly constructed AP1000 nuclear plants (VC Summer 2,3 / Vogtle 3,4). The table below represents our experience across many industries and sectors, and includes links to the aforementioned case studies.
Project | Client | Application | Project Location | Year | Products |
---|---|---|---|---|---|
Sea Water Cooling Expansion Project | Almacon | Power | Yanbu, Saudi Arabia | 2003 | 84", 136", 148" REJs w/ Control Units - Aluminum Bronze |
Termorio | ALSTOM | Power | Brasil | 2002 | 6" thru 64" REJs w/ Control Units |
Al Hidd | ALSTOM | Power | Bahrain | 2002 | 72" and 102" REJs w/ Control Units |
Keppel Merlimau | ALSTOM | Power | Singapore | 2005 | 14" thru 106" REJs w/ Control Units |
Elm Road Generating Stations-Units 1&2 | Bechtel | Power | Oak Creek, WI | USA | 2007 | 8" thru 66" REJs w/ Control Units |
Nebraska City Power | Black & Veatch | Power | Nebraska City, NE | USA | 2007 | 2" thru 78" REJs w/ Control Units |
Ras Laffan Common | Cooling Water, Ph.1 Cat1 CCIC | Oil & Gas | Qatar | 2003 | 60" thru 144" Dismantling |
Ras Laffan Common | Cooling Water, Ph.1 Cat1 CCIC | Oil & Gas | Qatar | 2009 | 28" thru 138" Dismantling |
VC Summer Nuclear | Chicago Bridge & Iron | Power-Nuclear | Jenkinsville, SC | USA | 2013-2014 | 36" & 108" In-Line Pressure Balanced REJs; 120" single and multiple arch REJs |
Vogtle Electric | Chicago Bridge & Iron | Power-Nuclear | Waynesboro, GA | USA | 2013-2014 | 36" & 108" In-Line Pressure Balanced REJs; 120" single and multiple arch REJs |
Ras Laffan Common | Dodsal Engineering & Construction | Oil & Gas | Qatar | 2009 | 60" thru 138" Dismantling REJs w/ Control Units |
United Olfeins Complex Project | Fluor Daniel Intercontinental | Petrochemical | Jubail, Saudi Arabia | 2003 | 12" thru 60" REJs w/ Control Units |
Hamaca Crude Upgrader Project | Grupo Alvica USA, LLC | Oil & Gas | Venezuela | 2002 | 4" thru 36" REJs w/ Control Units |
Planta Esde III | ICA Fluor through Oilmark Services | Mining | Cananea, Sonora Mexico | 2013 | 1" thru 36" REJs w/ Control Units, over 100 pcs |
Goro Nickel Project | Inco Goro Nickel | Mining | New Caledonia | 2006 | 32" thru 72" REJs |
Brayton Point Closed Loop Cooling Project | Kiewit | Power | Somerset, MA | USA | 2010 | 60" thru 132" Dismantling REJs w/ Control Units |
Carlsbad | Kiewit | Desalination | Carlsbad, CA | USA | 2014-2015 | 5" thru 16" Concentrcic and Eccentric Reducing REJs w/ Control Units |
Kusile Power Station | Lesedi through Crane | Power | Mpumalanga | 2013 | 1.5" thru 28" REJs w/ rods, over 300 pcs |
NASA, A-3 Test Stand, Stennis Space Center | M & D Mechanical | Aerospace | Stennis Space Center, MS| USA | 2010 | 1" thru 24" REJs w/ Control Units, over 700 pcs |
Genentech CCP2 Bldg 2 and 3 | Marelich Mechanical | Pharmaceutical | California | USA | 2006 | 2" thru 18" REJs w/ Control Units |
Minera Escondida Ltd-Sulphide Leach Project | Outokumpu | Mining | Chile | 2005 | 10" thru 42" PTFE lined REJs w/ Control Units |
Waigagoqiao PP Phase II | Siemens | Power | China | 2004 | 102" REJs |
Newark Energy Center | Skanska | Power | Newark, NJ | USA | 2013-2014 | 3" thru 78" REJs w/ Control Units |
Wayne County Combined Cycle Plant | TIC | Power | Goldsboro, NC | USA | 2011 | 4" thru 102" REJs w/ Control Units |
DC Water | Ulliman Schutte Construction through Plant Piping Products | Municipal | Washington, DC | USA | 2013 | 36" thru 72" REJs w/ Control Units |